Case studies
- CPI · 2025An over-engineered recruiting platform its own team couldn’t launch, cut down until it shipped
A well-built applicant-tracking system that could not keep itself running. I deleted about 8,500 lines of infrastructure, moved search off OpenSearch with no cutover, and cut a nearly two-day migration to six hours.
- Doof! Media · 2024An embarrassing WordPress site, rebuilt from scratch and carrying the show years later
A slow, generic WordPress site rebuilt as an Art Deco billboard modelled in Blender, with years of episodes extracted from WordPress intact. Roughly two years in production, about four hours of downtime total.
- CAI International · 2022A legacy macOS app that had to become a web app before a merger deadline
A container-leasing business ran on a legacy macOS desktop app, with a merger closing in. I joined the rebuild, reverse-engineered the old app screen by screen, and we finished in time for the two companies to train on the new app instead of the dead one.